[fusion_builder_container hundred_percent=”no” hundred_percent_height=”no” hundred_percent_height_scroll=”no” hundred_percent_height_center_content=”yes” equal_height_columns=”no” menu_anchor=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” status=”published” publish_date=”” class=”” id=”” background_color=”” background_image=”” background_position=”center center” background_repeat=”no-repeat” fade=”no” background_parallax=”none” enable_mobile=”no” parallax_speed=”0.3″ video_mp4=”” video_webm=”” video_ogv=”” video_url=”” video_aspect_ratio=”16:9″ video_loop=”yes” video_mute=”yes” video_preview_image=”” border_size=”” border_color=”” border_style=”solid” margin_top=”35″ margin_bottom=”” padding_top=”” padding_right=”” padding_bottom=”” padding_left=””][fusion_builder_row][fusion_builder_column type=”1_1″ layout=”1_1″ spacing=”” center_content=”no” link=”” target=”_self” min_height=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” background_color=”” background_image=”” background_image_id=”” background_position=”left top” background_repeat=”no-repeat” hover_type=”none” border_size=”0″ border_color=”” border_style=”solid” border_position=”all” padding_top=”” padding_right=”” padding_bottom=”” padding_left=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=”” last=”no”][fusion_text columns=”” column_min_width=”” column_spacing=”” rule_style=”default” rule_size=”” rule_color=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””]
Eaton Fuller Hybrid Transmission Sgàineadh Code 116 – High Voltage Relays -(MY08 Systems)
[/fusion_text][/fusion_builder_column][/fusion_builder_row][/fusion_builder_container][fusion_builder_container hundred_percent=”no” hundred_percent_height=”no” hundred_percent_height_scroll=”no” hundred_percent_height_center_content=”yes” equal_height_columns=”no” menu_anchor=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” status=”published” publish_date=”” class=”” id=”” background_color=”” background_image=”” background_position=”center center” background_repeat=”no-repeat” fade=”no” background_parallax=”none” enable_mobile=”no” parallax_speed=”0.3″ video_mp4=”” video_webm=”” video_ogv=”” video_url=”” video_aspect_ratio=”16:9″ video_loop=”yes” video_mute=”yes” video_preview_image=”” border_size=”” border_color=”” border_style=”solid” margin_top=”” margin_bottom=”” padding_top=”” padding_right=”” padding_bottom=”” padding_left=””][fusion_builder_row][fusion_builder_column type=”1_1″ layout=”1_1″ spacing=”” center_content=”no” link=”” target=”_self” min_height=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” background_color=”” background_image=”” background_image_id=”” background_position=”left top” background_repeat=”no-repeat” hover_type=”none” border_size=”0″ border_color=”” border_style=”solid” border_position=”all” padding_top=”” padding_right=”” padding_bottom=”” padding_left=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=”” last=”no”][fusion_text columns=”” column_min_width=”” column_spacing=”” rule_style=”default” rule_size=”” rule_color=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””]
Sgàineadh code for Eaton Hybrid Drive Siostaman modailean (MY08) EH-8E306A-U, EH-8E306A-UPG, EH-8E306A-UP, EH-8E306A-CD, EH-8E306A-T, EH-6E606B-CD. Leugh gu h-ìosal gus ionnsachadh mar a nì thu deuchainn, soilleir agus socraicheadh coire code mearachdan airson do Freightliner, Mack, Peterbilt, Kenworth, Volvo, Eadar-nàiseanta, agus trom-dleastanas làraidh agus uidheam. The High-Voltage Relays are located inside the Power Electronics Carrier (PEC) anns an aonad Relay Box. There is 1 precharge relay on the positive side, an additional relay on the positive, agus 1 on the negative for a total of 3. Tha iad sin a relays Mar as àbhaist tha fosgailte nuair a tha an siostam air falbh. Tha relays Tha smachd tro Inverter.
Sgàineadh Code 116 – High Voltage Relays Detection
Tha na leanas preconditions bhith air an coinneachadh mus deach an siostam detects an coire:
- Inverter Ignition bholtaids a tha nas motha na 7 volts agus nas lugha na 16 volts.
Nota: Nuair a troubleshooting an tàmh code iomradh a thoirt air an Bathar Breithneachaidh Mode (PDM)
Cor na h-Sgàineadh a chur Code Gnìomhach
- IMF 10 is set when the Inverter detects the input voltage measured at the capacitor is less than 210 volts within 3 seconds after the sub-relay closed in the Relay Box.
- IMF 14 is set when only the negative relay in the Relay Box is on and capacitor voltage decreases less than 10 volts/5 seconds when initial capacitor voltage was greater than 200 volts and motor speed less than 500 min-1, or there is a detect error in the initial check.
Fallback Nuair Sgàineadh Code 116 air a chur na cumhaichean a leanas a 'tachairt:
- Buidhe Shoilleir "Check Hybrid" solas blinks airson FMI 10 and remains solid for FMI 14.
- Sgàineadh a stòradh ann hcm memory.
- Inverter shuts bholtaids àrd-siostam dheth.
- Hcm a 'leantainn gus smachd a chumail dà-chonnaidh charbad ann an dìosail a-mhàin.
- Transmission dearmad tòiseachadh gear gu 1d.
[/fusion_text][fusion_text columns=”” column_min_width=”” column_spacing=”” rule_style=”default” rule_size=”” rule_color=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””]
Cor na h-Sgàineadh a chur Code tàmh
-Mhàin tàmh sgàinidhean Faodar fhuadach à Transmission Electronic Control Aonad (TECU) no hcm eachdraidh a 'cleachdadh ServiceRanger. Tha TECU fèin-obrachail a 'glanadh na sgàinidhean bho eachdraidh an dèidh 200 uairean a thìde agus an hcm fèin-obrachail a 'glanadh na sgàinidhean bho eachdraidh an dèidh a' choire air a bhith na tàmh airson 200 hours.
Tha seo a 'choire còd a bhith air adhbharachadh le sam bith de na leanas:
- IMF 10
- PEC
- APG
- Inverter
- DC high-voltage cable
- DC cable interlock loops
- leisge Switch
- Seirbheis Switch
- IMF 14
- Inverter
- PEC
[/fusion_text][/fusion_builder_column][/fusion_builder_row][/fusion_builder_container][fusion_builder_container hundred_percent=”no” hundred_percent_height=”no” hundred_percent_height_scroll=”no” hundred_percent_height_center_content=”yes” equal_height_columns=”no” menu_anchor=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” status=”published” publish_date=”” class=”” id=”” background_color=”” background_image=”” background_position=”center center” background_repeat=”no-repeat” fade=”no” background_parallax=”none” enable_mobile=”no” parallax_speed=”0.3″ video_mp4=”” video_webm=”” video_ogv=”” video_url=”” video_aspect_ratio=”16:9″ video_loop=”yes” video_mute=”yes” video_preview_image=”” border_size=”” border_color=”” border_style=”solid” margin_top=”” margin_bottom=”” padding_top=”” padding_right=”” padding_bottom=”” padding_left=””][fusion_builder_row][fusion_builder_column type=”1_1″ layout=”1_1″ spacing=”” center_content=”no” link=”” target=”_self” min_height=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” background_color=”” background_image=”” background_image_id=”” background_position=”left top” background_repeat=”no-repeat” hover_type=”none” border_size=”0″ border_color=”” border_style=”solid” border_position=”all” padding_top=”” padding_right=”” padding_bottom=”” padding_left=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=”” last=”no”][fusion_text columns=”” column_min_width=”” column_spacing=”” rule_style=”default” rule_size=”” rule_color=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””]
Sgàineadh Code 116 – High Voltage Relays Test
[/fusion_text][/fusion_builder_column][/fusion_builder_row][/fusion_builder_container][fusion_builder_container hundred_percent=”no” hundred_percent_height=”no” hundred_percent_height_scroll=”no” hundred_percent_height_center_content=”yes” equal_height_columns=”no” menu_anchor=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” status=”published” publish_date=”” class=”” id=”” background_color=”” background_image=”” background_position=”center center” background_repeat=”no-repeat” fade=”no” background_parallax=”none” enable_mobile=”no” parallax_speed=”0.3″ video_mp4=”” video_webm=”” video_ogv=”” video_url=”” video_aspect_ratio=”16:9″ video_loop=”yes” video_mute=”yes” video_preview_image=”” border_size=”” border_color=”” border_style=”solid” margin_top=”” margin_bottom=”” padding_top=”” padding_right=”” padding_bottom=”” padding_left=””][fusion_builder_row][fusion_builder_column type=”1_1″ layout=”1_1″ spacing=”” center_content=”no” link=”” target=”_self” min_height=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” background_color=”” background_image=”” background_image_id=”” background_position=”left top” background_repeat=”no-repeat” hover_type=”none” border_size=”0″ border_color=”” border_style=”solid” border_position=”all” padding_top=”” padding_right=”” padding_bottom=”” padding_left=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=”” last=”no”][fusion_text columns=”” column_min_width=”” column_spacing=”” rule_style=”default” rule_size=”” rule_color=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””]
Comharrachadh phàirt MY08 Systems:
[/fusion_text][/fusion_builder_column][/fusion_builder_row][/fusion_builder_container][fusion_builder_container hundred_percent=”yes” hundred_percent_height=”no” hundred_percent_height_scroll=”no” hundred_percent_height_center_content=”yes” equal_height_columns=”no” menu_anchor=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” status=”published” publish_date=”” class=”” id=”” background_color=”” background_image=”” background_position=”center center” background_repeat=”no-repeat” fade=”no” background_parallax=”none” enable_mobile=”no” parallax_speed=”0.3″ video_mp4=”” video_webm=”” video_ogv=”” video_url=”” video_aspect_ratio=”16:9″ video_loop=”yes” video_mute=”yes” video_preview_image=”” border_size=”” border_color=”” border_style=”solid” margin_top=”” margin_bottom=”” padding_top=”” padding_right=”10%” padding_bottom=”” padding_left=”10%”][fusion_builder_row][fusion_builder_column type=”1_3″ layout=”1_3″ spacing=”” center_content=”no” link=”” target=”_self” min_height=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” background_color=”” background_image=”” background_image_id=”” background_position=”left top” background_repeat=”no-repeat” hover_type=”none” border_size=”0″ border_color=”” border_style=”solid” border_position=”all” padding_top=”” padding_right=”” padding_bottom=”” padding_left=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=”” last=”no”][fusion_imageframe image_id=”14474|full” max_width=”” style_type=”” blur=”” stylecolor=”” hover_type=”none” bordersize=”” bordercolor=”” borderradius=”” align=”center” lightbox=”no” gallery_id=”” lightbox_image=”” lightbox_image_id=”” alt=”56 Delphi-Way co-aonadh an ceanglaiche an View” link=”” linktarget=”_self” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]https://www.globaltransmissionsupply.com/wp-content/uploads/Inverter-56-Way-Mating-Connector-View.jpg[/fusion_imageframe][fusion_text columns=”” column_min_width=”” column_spacing=”” rule_style=”default” rule_size=”” rule_color=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””]
56-Way co-aonadh an ceanglaiche an View
[/fusion_text][/fusion_builder_column][fusion_builder_column type=”1_3″ layout=”1_3″ spacing=”” center_content=”no” link=”” target=”_self” min_height=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” background_color=”” background_image=”” background_image_id=”” background_position=”left top” background_repeat=”no-repeat” hover_type=”none” border_size=”0″ border_color=”” border_style=”solid” border_position=”all” padding_top=”” padding_right=”” padding_bottom=”” padding_left=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=”” last=”no”][fusion_imageframe image_id=”14635|full” max_width=”” style_type=”” blur=”” stylecolor=”” hover_type=”none” bordersize=”” bordercolor=”” borderradius=”” align=”center” lightbox=”no” gallery_id=”” lightbox_image=”” lightbox_image_id=”” alt=”Bholtaids àrd DC an ceanglaiche an View Yazaki ceanglaiche” link=”” linktarget=”_self” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]https://www.globaltransmissionsupply.com/wp-content/uploads/High-Voltage-DC-Connector-View.jpg[/fusion_imageframe][fusion_text columns=”” column_min_width=”” column_spacing=”” rule_style=”default” rule_size=”” rule_color=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””]
Bholtaids àrd DC an ceanglaiche an View Yazaki ceanglaiche
[/fusion_text][/fusion_builder_column][fusion_builder_column type=”1_3″ layout=”1_3″ spacing=”” center_content=”no” link=”” target=”_self” min_height=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” background_color=”” background_image=”” background_image_id=”” background_position=”left top” background_repeat=”no-repeat” hover_type=”none” border_size=”0″ border_color=”” border_style=”solid” border_position=”all” padding_top=”” padding_right=”” padding_bottom=”” padding_left=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=”” last=”no”][fusion_imageframe image_id=”14213|medium” max_width=”” style_type=”” blur=”” stylecolor=”” hover_type=”none” bordersize=”” bordercolor=”” borderradius=”” align=”center” lightbox=”no” gallery_id=”” lightbox_image=”” lightbox_image_id=”” alt=”Mating Connector View Deutsch 19 – Way” link=”” linktarget=”_self” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]https://www.globaltransmissionsupply.com/wp-content/uploads/Eaton-Fuller-Harness-Connector-View-300×289.jpg[/fusion_imageframe][fusion_text columns=”” column_min_width=”” column_spacing=”” rule_style=”default” rule_size=”” rule_color=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””]
Mating Connector View Deutsch 19 – Way
[/fusion_text][/fusion_builder_column][/fusion_builder_row][/fusion_builder_container][fusion_builder_container hundred_percent=”no” hundred_percent_height=”no” hundred_percent_height_scroll=”no” hundred_percent_height_center_content=”yes” equal_height_columns=”no” menu_anchor=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” status=”published” publish_date=”” class=”” id=”” background_color=”” background_image=”” background_position=”center center” background_repeat=”no-repeat” fade=”no” background_parallax=”none” enable_mobile=”no” parallax_speed=”0.3″ video_mp4=”” video_webm=”” video_ogv=”” video_url=”” video_aspect_ratio=”16:9″ video_loop=”yes” video_mute=”yes” video_preview_image=”” border_size=”” border_color=”” border_style=”solid” margin_top=”” margin_bottom=”” padding_top=”” padding_right=”” padding_bottom=”” padding_left=””][fusion_builder_row][fusion_builder_column type=”1_1″ layout=”1_1″ spacing=”” center_content=”no” link=”” target=”_self” min_height=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” background_image_id=”” background_color=”#000000″ background_image=”” background_position=”left top” undefined=”” background_repeat=”no-repeat” hover_type=”none” border_size=”0″ border_color=”” border_style=”solid” border_position=”all” padding_top=”” padding_right=”” padding_bottom=”” padding_left=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=”” last=”no”][fusion_text columns=”” column_min_width=”” column_spacing=”” rule_style=”default” rule_size=”” rule_color=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””]
NOTE: Coimheadaibh air an Eaton Hybrid pàirtean agus ceanglaiche Àite Àiteachan airson an ceanglaiche ann MY08 Systems
[/fusion_text][/fusion_builder_column][fusion_builder_column type=”1_1″ layout=”1_1″ spacing=”” center_content=”no” link=”” target=”_self” min_height=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” background_color=”” background_image=”” background_image_id=”” background_position=”left top” background_repeat=”no-repeat” hover_type=”none” border_size=”0″ border_color=”” border_style=”solid” border_position=”all” padding_top=”” padding_right=”” padding_bottom=”” padding_left=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=”” last=”no”][fusion_imageframe image_id=”14666|full” max_width=”” style_type=”” blur=”” stylecolor=”” hover_type=”none” bordersize=”” bordercolor=”” borderradius=”” align=”center” lightbox=”no” gallery_id=”” lightbox_image=”” lightbox_image_id=”” alt=”Inverter PEC connectors Eaton Fuller Hybrid transmission” link=”” linktarget=”_self” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]https://www.globaltransmissionsupply.com/wp-content/uploads/Inverter-PEC-connectors.png[/fusion_imageframe][/fusion_builder_column][/fusion_builder_row][/fusion_builder_container][fusion_builder_container hundred_percent=”no” hundred_percent_height=”no” hundred_percent_height_scroll=”no” hundred_percent_height_center_content=”yes” equal_height_columns=”no” menu_anchor=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” status=”published” publish_date=”” class=”” id=”” background_color=”” background_image=”” background_position=”center center” background_repeat=”no-repeat” fade=”no” background_parallax=”none” enable_mobile=”no” parallax_speed=”0.3″ video_mp4=”” video_webm=”” video_ogv=”” video_url=”” video_aspect_ratio=”16:9″ video_loop=”yes” video_mute=”yes” video_preview_image=”” border_size=”” border_color=”” border_style=”solid” margin_top=”” margin_bottom=”” padding_top=”” padding_right=”” padding_bottom=”” padding_left=””][fusion_builder_row][fusion_builder_column type=”1_1″ layout=”1_1″ spacing=”” center_content=”no” link=”” target=”_self” min_height=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” background_color=”” background_image=”” background_image_id=”” background_position=”left top” background_repeat=”no-repeat” hover_type=”none” border_size=”0″ border_color=”” border_style=”solid” border_position=”all” padding_top=”” padding_right=”” padding_bottom=”” padding_left=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=”” last=”no”][fusion_modal name=”warnings_cautions” title=”na Sìde & rabhadh” size=”large” background=”” border_color=”” show_footer=”yes” class=”” id=””]Danger: Danger sealltainn bidh thu a dhroch leòn no a mharbhadh ma nach eil a 'leantainn modh comharraichte.
rabhadh: Rabhadh sealltainn an cunnart grad, a dh'fhaodadh a thoradh ann an droch leòn pearsanta mura bheil thu a 'leantainn modh-obrach a chomharrachadh.
Rabhaidh: Rabhaidh a 'sealltainn càr no seilbh milleadh dh'fhaodadh tachairt mura bheil thu a' leantainn modh-obrach a chomharrachadh.
Nota: Cuimhnich a 'sealltainn fiosrachadh a bharrachd a bhios a' cuideachadh ann an breithneachadh no càradh de phàirt / siostam.
Lean na modhan-obrach a shònrachadh ann an comharraichte òrdugh a sheachnadh leòn pearsanta:
1. Ma tha an bholtaids àrd-durcain a tha timcheall air a 'charbad agus an lockout tha air a stàladh air a' PEC, an t-aon neach a bu chòir cead a bhith a 'tòiseachadh a' charbad an neach a chuir an ainm ri lockout tag.
2. Mus ag obair air carbad no a 'fàgail chab fhad' sa bha an t-einnsean a 'ruith, bu chòir dhuibh a chur an gluasad luamhan ann an "N" a 'suidheachadh an pàirceadh bhris, agus bacadh a cuibhlichean.
3. Airson adhbharan sàbhailteachd, an-còmhnaidh a 'dol an sàs an t-seirbheis breicichean ron taghadh gear dreuchdan à "N."
4. Mus tòisich carbad-còmhnaidh a bhith nan suidhe ann an suidheachan aig an dràibhear, tagh "N" air a 'gluasad smachd, agus chuir a 'pàirceadh breicichean.
5. Ann an carbadan le ePTO, an t-einnsean agus / no
Motor / Generator a 'tòiseachadh ann an ePTO modh. Never 'cluich sam bith cumail suas no ag obair air a' chàir, fhad 'sa bha ann am modh seo.
6. 12-Volt Battery deimhinneach (+) agus àicheil (-) feumar a bhith glè ron sam bith tàthaidh air carbad sam bith a Hybrid uidheamaichte.
Rabhaidh: Lean na modhan-obrach a shònrachadh ann an comharraichte òrdugh a sheachnadh uidheam malfunction no milleadh.
Rabhaidh: Chan eil an leigeil mu sgaoil pàirceadh bhris no feuchainn a thaghadh gear gus an bruthadh èadhair a tha aig an ìre cheart.
Rabhaidh: Airson cron a sheachnadh ri sgaoileadh aig àm a tòbhadh an àite gluasad luamhan ann an "n" agus tog an iomairt cuibhlichean far na talmhainn no dì an driveline.
Àrd-bholtaids Sìde & rabhadh
- Cleachd CO2 no tioram Chemical innealan-smàlaidh.
- Tha an àrd-uèirichean bholtaids a tha air a chòmhdach ann an orains blàthachaidh no convoluted tubing agus comharraichte le rabhadh bileagan aig connectors.
- All Eaton® Hybrid Diesel / Electric carbadan a thèid a chomharrachadh 'Hybrid’ air an taobh a-muigh a 'chàir, còmhla ris a 'gluasad bileag air an dash.
- Coimheadaibh air OEM airson sònraichte location de chassis muin dà-chonnaidh phàirtean.
- Chan eil an gearradh ann an orains bholtaids àrd-càbaill.
- Chan eil gearradh a-steach no fosgail PEC.
- Chan eil gearradh a-steach no fosgail DC / DC Converter.
- Chan eil gearradh a-steach no fosgail Inverter.
A sòn bufair feumar a stèidheachadh agus àrd-bholtaids a chòmhdach miotagan rubair (clas 0 le leathar-dìon) Tha feum air ro-làimh a bhith ag obair air àrd-bholtaids. Mura lean an stiùireadh seo, dh'fhaodadh a dhroch leòn pearsanta no bàs.
Tha rubair a chòmhdach miotagan a dh'fheumas a bhith air caitheamh fhad 'sa bha ag obair air an bholtaids àrd-siostam a tha a' chlas 0 le leathar-dìon. Tha miotagan rubair bu chòir deuchainn ron h-uile a leanas a 'cleachdadh còmhdach-blàthachaidh miotagan rubair deuchainnean modh-obrach a gheibhear ann an "Breithneachaidh Innealan / Seirbheis Foillseachaidhean" air duilleag 6. Mura lean an stiùireadh seo, dh'fhaodadh a dhroch leòn pearsanta no bàs.
Mus sgrùdadh no ag obair sam bith air bholtaids àrd-càbaill no co-phàirtean an "Àrd-bholtaids Seirbheis Shutdown agus Cumhachd-Up Modh-obrach" air duilleag 4 bu chòir a leantainn. Mura lean an stiùireadh seo, dh'fhaodadh a dhroch leòn pearsanta no bàs.
Tha Lockout agus Tagout innealan Cha bu chòir a thoirt air falbh leis an teicneolaiche a chur an Lockout agus Tagout innealan air an càr. Mura lean an stiùireadh seo, dh'fhaodadh a dhroch leòn pearsanta no bàs.
Àrd-bholtaids a chòmhdach miotagan rubair (clas 0 le leathar-dìon) Feumar nuair a bh'air a bhith ag obair sam bith air a '
bholtaids àrd-càbaill. The "Àrd-bholtaids Seirbheis Shutdown agus Cumhachd-Up Modh-obrach" air duilleag 4 Feumar leantainn mus deach a thoirt air falbh sam bith bholtaids àrd-càbaill. Mura lean an stiùireadh seo, dh'fhaodadh a dhroch leòn pearsanta no bàs.
Àrd-bholtaids càbaill is uèirichean tha orains agus tha rabhadh bileag aig a 'connectors. Àrd-bholtaids co-phàirtean a tha comharraichte le bileag. Àrd-bholtaids a chòmhdach miotagan rubair (clas 0 le leathar-dìon) Feumaidh a chleachdadh nuair a tha ag obair air gin de na co-phàirtean. Mura lean an stiùireadh seo, dh'fhaodadh a dhroch leòn pearsanta no bàs.
Àrd-bholtaids Seirbheis Shutdown Dòighean-obrach
1. Follow "Àrd-bholtaids Obair Sgìre" modh.
2. Locate an dearg PEC Seirbheis Switch air beulaibh na PEC agus a phutadh chur dheth.
3. Thoir air falbh an t-Seirbheis Switch Cover is a stàladh an Lockout camagan (J48506).
4. Tag cuireadh gu Lockout camagan.
5. Dèanamh cinnteach gum PEC Seirbheis Switch nach urrainn gluasad bho far an suidheachadh.
6. Leig an t-siostam a chaidh a shuidheachadh airson a 'char as lugha 5 mionaid a leigeil bholtaids àrd.
7. Ceangail ServiceRanger agus faic Dàta Monitor PID 116 ris an cante "Àrd-bholtaids Battery Comais." chleachdadh SPN 520323 airson J1939 ceangal "Battery bholtaids RB" (Relay Box).
8. Tha an bholtaids a bu chòir a bhith 30 volts no nas lugha. Ma tha an bholtaids a tha os cionn 30 volts, Chan eil obair air a 'charbad agus fios Eaton® aig 1-800-826-COBHAIR (4357).
9. Tionndaidh Ignition key dheth agus a dhol air adhart a chàradh no troubleshooting cheum.
Nota: Tha an bholtaids a 'tuiteam gu neoni nuair a tha na prìomh dheth.
Àrd-bholtaids Seirbheis Cumhachd-Up Modh-obrach
1. Stàlaich h-uile àrd-bholtaids connectors a-steach glaiste dreuchdan aca.
2. Ma tha thu an neach a tha ag obair air a 'charbaid, a thoirt air falbh Lockout camagan agus tag.
3. Reinstall an Lockout camagan thairis air an t-Seirbheis Switch.
4. Pull an t-Seirbheis Switch-mach agus leig carbad seata airson 2 mionaid.
5. Start vehicle when appropriate.[/fusion_modal][fusion_modal name=”component_location” title=”Eaton Hybrid pàirtean agus ceanglaiche Àite ” size=”large” background=”#ffffff” border_color=”” show_footer=”yes” class=”” id=””]

[/fusion_modal][fusion_modal name=”component_location2″ title=”Eaton Hybrid pàirtean agus ceanglaiche Àite MY09 Systems” size=”large” background=”#ffffff” border_color=”” show_footer=”yes” class=”” id=””]

[/fusion_modal][/fusion_builder_column][/fusion_builder_row][/fusion_builder_container][fusion_builder_container hundred_percent=”no” hundred_percent_height=”no” hundred_percent_height_scroll=”no” hundred_percent_height_center_content=”yes” equal_height_columns=”no” menu_anchor=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” status=”published” publish_date=”” class=”” id=”” background_color=”” background_image=”” background_position=”center center” background_repeat=”no-repeat” fade=”no” background_parallax=”none” enable_mobile=”no” parallax_speed=”0.3″ video_mp4=”” video_webm=”” video_ogv=”” video_url=”” video_aspect_ratio=”16:9″ video_loop=”yes” video_mute=”yes” video_preview_image=”” border_size=”” border_color=”” border_style=”solid” margin_top=”” margin_bottom=”” padding_top=”” padding_right=”” padding_bottom=”” padding_left=””][fusion_builder_row][fusion_builder_column type=”1_1″ layout=”1_1″ spacing=”” center_content=”no” link=”” target=”_self” min_height=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” background_color=”” background_image=”” background_image_id=”” background_position=”left top” background_repeat=”no-repeat” hover_type=”none” border_size=”0″ border_color=”” border_style=”solid” border_position=”all” padding_top=”” padding_right=”” padding_bottom=”” padding_left=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=”” last=”no”][fusion_content_boxes layout=”clean-horizontal” columns=”2″ title_size=”18px” heading_size=”3″ title_color=”#ffffff” body_color=”#ffffff” backgroundcolor=”#4f4f4f” icon=”” iconflip=”” iconrotate=”” iconspin=”no” iconcolor=”” icon_circle=”” icon_circle_radius=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” icon_size=”” icon_hover_type=”” hover_accent_color=”” image=”” image_id=”” image_width=”” image_height=”” link_type=”” button_span=”” link_area=”” link_target=”” icon_align=”left” animation_type=”” animation_delay=”” animation_offset=”” animation_direction=”left” animation_speed=”0.3″ margin_top=”” margin_bottom=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””][fusion_content_box title=”CHEUM 1. Dearbhaich FMIs-diugh.” backgroundcolor=”” icon=”” iconflip=”” iconrotate=”” iconspin=”no” iconcolor=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” image=”” image_id=”” image_width=”” image_height=”” link=”” linktext=”Leugh Tuilleadh” link_target=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]
- Ath-bhreithneachadh agus a 'leantainn na Sìde & rabhadh.
- Fhaighinn air ais Gnìomhach coire còdan agus FMIs ServiceRanger le bhith a 'cleachdadh na 9 Way-Breithneachaidh ceanglaiche.
Danger: Faicibh Modhan dùnadh seirbheis àrd-bholtaid agus cumhachd-suas. Lean na modhan-obrach a sheachnadh clisgeadh, losgadh no bàs bho dhroch làimhseachadh bholtaids àrd-. - Dè FMIs tha an làthair
- Ma tha Sgàineadh a 'Chòd 116 IMF 14 clàraichte, a 'dol gu Ceum 9.
- Ma tha Sgàineadh a 'Chòd 116 IMF 10 clàraichte, a 'dol gu Ceum 2.
- If no Fault Codes are listed, The Service Switch was pushed in. Rach gu Step 10.
[/fusion_content_box][fusion_content_box title=”CHEUM 2. Verify Data Monitor parameters.” backgroundcolor=”” icon=”” iconflip=”” iconrotate=”” iconspin=”no” iconcolor=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” image=”” image_id=”” image_width=”” image_height=”” link=”” linktext=”Leugh Tuilleadh” link_target=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]
- prìomh air.
- Ceangail ServiceRanger gu 9 Way-Breithneachaidh ceanglaiche anns a 'chab.
- Tagh an "Dàta Monitor" roghainn.
- View the Battery Pack Voltage (BCU1) PID 118 in the high- voltage Battery list:
- If the Battery Pack Voltage (BCU1) PID 118 is greater than 200 volts, a 'dol gu Ceum 3.
- If the Battery Pack Voltage (BCU1) PID 118 tha nas lugha na 200 volts, an àite an Power Electronics Carrier (PEC), an uair sin a 'dol gu Ceum 10.
[/fusion_content_box][/fusion_content_boxes][fusion_content_boxes layout=”clean-horizontal” columns=”2″ title_size=”18px” heading_size=”3″ title_color=”#ffffff” body_color=”#ffffff” backgroundcolor=”#4f4f4f” icon=”” iconflip=”” iconrotate=”” iconspin=”no” iconcolor=”” icon_circle=”” icon_circle_radius=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” icon_size=”” icon_hover_type=”” hover_accent_color=”” image=”” image_id=”” image_width=”” image_height=”” link_type=”” button_span=”” link_area=”” link_target=”” icon_align=”left” animation_type=”” animation_delay=”” animation_offset=”” animation_direction=”left” animation_speed=”0.3″ margin_top=”” margin_bottom=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””][fusion_content_box title=”CHEUM 3. Verify continuity of Inverter connector circuits.” backgroundcolor=”” icon=”” iconflip=”” iconrotate=”” iconspin=”no” iconcolor=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” image=”” image_id=”” image_width=”” image_height=”” link=”” linktext=”Leugh Tuilleadh” link_target=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]
- prìomh dheth.
- If the vehicle is not equipped with a DC/DC Converter or APG, skip this step.
- Using ASTM Class 0 electrical insulating rubber gloves with leather protectors, disconnect the DC cable for the DC/DC Converter and APG at the PEC.
- With the key off, temporarily remove the Lockout Bracket and pull the Service Switch out.
- prìomh air.
- Is Sgàineadh Code 116 IMF 10 still Active in ServiceRanger?
- Ma tha Sgàineadh a 'Chòd 116 IMF 10 is Active with the DC/DC Converter and APG disconnected, a 'dol gu Ceum 4.
- Ma tha Sgàineadh a 'Chòd 116 IMF 10 is no longer Active with the DC/DC Converter and APG disconnected, key off and reinstall the Lockout Bracket on the PEC. Replace the Power Electronics Carrier (PEC), an uair sin a 'dol gu Ceum 10.
[/fusion_content_box][fusion_content_box title=”CHEUM 4. Verify continuity of PEC connector circuits to ground.” backgroundcolor=”” icon=”” iconflip=”” iconrotate=”” iconspin=”” iconcolor=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” image=”” image_id=”” image_width=”” image_height=”” link=”” linktext=”” link_target=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]
- prìomh dheth.
- Disconnect an PEC 19 Way ceanglaiche.
- Temporarily remove the Lockout Bracket and pull the Service Switch out.
Nota: Ensure the Key Switch is off. - Measure resistance at the PEC 19-Way Connector Terminal at the following pins:
- pin 17 gu Pin 19
- pin 9 gu Pin 11
- pin 13 gu Pin 15
- If the resistance between Pins 17 agus Pin 19 'S e 112-122 ohms agus an aghaidh bhon Pin 9 gu Pin 11 agus Pin 13 gu Pin 15 Tha gach 33-37 ohms, a 'dol gu Ceum 5.
- Ma aghaidh tha a-mach às an raon, a 'dol gu Ceum 6.
[/fusion_content_box][/fusion_content_boxes][fusion_content_boxes layout=”clean-horizontal” columns=”2″ title_size=”18px” heading_size=”3″ title_color=”#ffffff” body_color=”#ffffff” backgroundcolor=”#4f4f4f” icon=”” iconflip=”” iconrotate=”” iconspin=”no” iconcolor=”” icon_circle=”” icon_circle_radius=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” icon_size=”” icon_hover_type=”” hover_accent_color=”” image=”” image_id=”” image_width=”” image_height=”” link_type=”” button_span=”” link_area=”” link_target=”” icon_align=”left” animation_type=”” animation_delay=”” animation_offset=”” animation_direction=”left” animation_speed=”0.3″ margin_top=”” margin_bottom=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””][fusion_content_box title=”CHEUM 5. Verify continuity of Inverter connector circuits to ground.” backgroundcolor=”” icon=”” iconflip=”” iconrotate=”” iconspin=”no” iconcolor=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” image=”” image_id=”” image_width=”” image_height=”” link=”” linktext=”Leugh Tuilleadh” link_target=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]
- prìomh dheth.
- Reconnect the PEC 19-Way Connector.
- Disconnect an Inverter 56 Way-ceanglaiche.
- Inspect the connector pins for damaged, corroded and/or loose wires.
- Measure resistance between the Inverter 56-Way Connector at the following pins:
- pin 29 gu Pin 37
- pin 30 gu Pin 35
- pin 31 gu Pin 36 Nota: Gu socair a 'lùbadh an Inverter 56 Way-ceanglaiche Uidheaman-eich faisg air an ceanglaiche an fhad' sa 'cumail sùil air cur an aghaidh luachan.
- Ma tha an aghaidh eadar Pin 29 agus Pin 37 'S e 112-122 ohms agus an aghaidh bhon Pin 30 gu Pin 35 agus Pin 31 gu Pin 36 Tha gach 33-37 ohms, push the Service Switch on the PEC and reinstall the Lockout Bracket. Rach gu Step 8.
- Ma aghaidh tha a-mach às an raon, repair the Hybrid Harness between the PEC and Inverter, an uair sin a 'dol gu Ceum 10.
[/fusion_content_box][fusion_content_box title=”CHEUM 6. Verify continuity of PEC connector circuits.” backgroundcolor=”” icon=”” iconflip=”” iconrotate=”” iconspin=”” iconcolor=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” image=”” image_id=”” image_width=”” image_height=”” link=”” linktext=”” link_target=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]
- prìomh dheth.
- Remove the Air Filter Cover and Air Filter from the PEC. Refer to TRSM1000 for procedures.*
- An Inertia Switch is located at the front of the PEC inside the box and viewable when the Air Filter is removed.
- Using ASTM Class 0 electrical insulating rubber gloves with leather protectors, press the button on the top of the Inertia Switch until heard or felt a click. This switch must be depressed a set distance to reset the switch.
- Measure resistance at the PEC 19-Way Connector Terminal at the following pins:
- pin 17 gu Pin 19
- pin 9 gu Pin 11
- pin 13 gu Pin 15
- qIf the resistance between Pin 17 agus Pin 19 'S e 112-122 ohms agus an aghaidh bhon Pin 9 gu Pin 11 agus Pin 13 gu Pin 15 Tha gach 33-37 ohms, the Inertia Switch was tripped. Test is complete. Rach gu Step 10.
- Ma aghaidh tha a-mach às an raon, push in the Service Switch on the PEC and reinstall the Lockout Bracket, an uair sin a 'dol gu Ceum 7.
[/fusion_content_box][/fusion_content_boxes][fusion_content_boxes layout=”clean-horizontal” columns=”2″ title_size=”18px” heading_size=”3″ title_color=”#ffffff” body_color=”#ffffff” backgroundcolor=”#4f4f4f” icon=”” iconflip=”” iconrotate=”” iconspin=”no” iconcolor=”” icon_circle=”” icon_circle_radius=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” icon_size=”” icon_hover_type=”” hover_accent_color=”” image=”” image_id=”” image_width=”” image_height=”” link_type=”” button_span=”” link_area=”” link_target=”” icon_align=”left” animation_type=”” animation_delay=”” animation_offset=”” animation_direction=”left” animation_speed=”0.3″ margin_top=”” margin_bottom=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””][fusion_content_box title=”CHEUM 7. Verify continuity of Inverter connector circuits.” backgroundcolor=”” icon=”” iconflip=”” iconrotate=”” iconspin=”no” iconcolor=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” image=”” image_id=”” image_width=”” image_height=”” link=”” linktext=”Leugh Tuilleadh” link_target=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]
- prìomh dheth.
- Disconnect the DC High-Voltage Cable at the PEC Bulkhead and at the Inverter Bulkhead.
- Measure resistance between the Low-Voltage Interlock Pins on the PEC side of the DC High-Voltage Cable:
Nota: The Interlock Pins are the two small spade terminals located in the same opening.- If the resistance is 0–0.3 ohms between the Interlock Loop Pins, an àite an Power Electronics Carrier (PEC), an uair sin a 'dol gu Ceum 10.
- Ma aghaidh tha a-mach às an raon, an àite an DC bholtaids àrd-càball, an uair sin a 'dol gu Ceum 10.
[/fusion_content_box][fusion_content_box title=”CHEUM 8. Verify continuity of DC Cable from PEC to Inverter Connector circuits.” backgroundcolor=”” icon=”” iconflip=”” iconrotate=”” iconspin=”” iconcolor=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” image=”” image_id=”” image_width=”” image_height=”” link=”” linktext=”” link_target=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]
- prìomh dheth.
- Disconnect the DC High-Voltage Cable at the PEC Bulkhead and the Inverter Bulkhead.
- Measure the resistance of each high-voltage circuit on the cable:
- If the resistance of each high-voltage circuit in the cable is 1 ohm no nas lugha, an àite an Inverter, an uair sin a 'dol gu Ceum 10.
- Ma aghaidh tha a-mach às an raon, replace the DC High-Voltage Cable, an uair sin a 'dol gu Ceum 10.
[/fusion_content_box][/fusion_content_boxes][fusion_content_boxes layout=”clean-horizontal” columns=”2″ title_size=”18px” heading_size=”3″ title_color=”#ffffff” body_color=”#ffffff” backgroundcolor=”#4f4f4f” icon=”” iconflip=”” iconrotate=”” iconspin=”no” iconcolor=”” icon_circle=”” icon_circle_radius=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” icon_size=”” icon_hover_type=”” hover_accent_color=”#f41000″ image=”” image_id=”” image_width=”” image_height=”” link_type=”” button_span=”” link_area=”” link_target=”” icon_align=”left” animation_type=”” animation_delay=”” animation_offset=”” animation_direction=”left” animation_speed=”0.3″ margin_top=”” margin_bottom=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””][fusion_content_box title=”CHEUM 9. Verify Data Monitor parameters.” backgroundcolor=”” icon=”” iconflip=”” iconrotate=”” iconspin=”” iconcolor=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” image=”” image_id=”” image_width=”” image_height=”” link=”” linktext=”” link_target=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]
- Ceangail ServiceRanger gu 9 Way-Breithneachaidh ceanglaiche anns a 'chab.
- Tagh an "Dàta Monitor" roghainn.
- View the following parameters in the High-Voltage Battery list.
- Battery Pack Voltage (BCU1) PID 118
- Battery Voltage PID 116
- If the voltage readings on PID 116 agus PID 118 are within 10 volts a chèile, an àite an Power Electronics Carrier (PEC), an uair sin a 'dol gu Ceum 10.
- If the voltage readings on PID 116 agus PID 118 are greater than 10 volts a chèile, an àite an Inverter, an uair sin a 'dol gu Ceum 10.
[/fusion_content_box][fusion_content_box title=”CHEUM 10. Dearbhaich càradh.” backgroundcolor=”” icon=”” iconflip=”” iconrotate=”” iconspin=”no” iconcolor=”” circlecolor=”” circlebordersize=”” circlebordercolor=”” outercirclebordersize=”” outercirclebordercolor=”” image=”” image_id=”” image_width=”” image_height=”” link=”” linktext=”Leugh Tuilleadh” link_target=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]
- prìomh dheth.
- Connectors a h-uile ath-cheangal agus an droch bhataraidh càball.
- prìomh air.
- còdan soilleir, fhaicinn Soilleir tàmh sgàinidhean.
- Stiùir an càr agus a 'feuchainn ri ath-shuidheachadh an còd.
- Lorg airson còdan, fhaicinn Faic dèanadach agus neo-ghnìomhach sgàinidhean.
- Ma eil còdan, deuchainn crìochnaichte.
- Ma tha Sgàineadh a 'Chòd 116 a rèir coltais, cuir fios gu Eaton aig 1- 800-826-COBHAIR (4357). Repeat this Step (ceum 10).
- Ma tha an còd eile seach 116 a rèir coltais, fhaicinn Sgàineadh Code clàr-innse Clàr-.
[/fusion_content_box][/fusion_content_boxes][/fusion_builder_column][/fusion_builder_row][/fusion_builder_container][fusion_global id=”13788″]